Penerapan Layout Produksi Dalam Meningkatkan Efisiensi Produksi Pada PT Metindo Era Sakti

Pramesty, Dinda Alexandra (2023) Penerapan Layout Produksi Dalam Meningkatkan Efisiensi Produksi Pada PT Metindo Era Sakti. Sarjana (S1) thesis, Universitas Islam "45" Bekasi.

[img] Text
PENDAHULUAN DINDA PERPUS GEDUNG H.pdf

Download (953kB)
[img] Text
BAB 1.pdf

Download (499kB)
[img] Text
BAB 2.pdf
Restricted to Repository staff only

Download (371kB) | Request a copy
[img] Text
BAB 3.pdf
Restricted to Repository staff only

Download (553kB) | Request a copy
[img] Text
BAB 4.pdf
Restricted to Repository staff only

Download (791kB) | Request a copy
[img] Text
BAB 5.pdf

Download (153kB)
[img] Text
DAFTAR PUSTAKA (1).pdf

Download (269kB)

Abstract

The purpose of this study is to apply a production layout by applying line balancing to determine efficiency and to provide an evaluation regarding the implementation of the layout at PT Metindo Era Sakti. The research method uses qualitative descriptive research, namely telling, interpreting existing data, implementing it through data collection, compilation, analysis and interpretation of data on the object under study. At PT Metindo Era Sakti, there are 7 stages with 3 work stations in the production process, namely: Tub Sub Assy Tilt Cabin, S/A Radiator Upper Center Support, Outer Rocker Panel, Steering Hanger Beam, Center Pillar Inn, Panel Comp, RR Floor Front, Beam Comp Front Bump. The production process seen from the total delay and total efficiency has different levels which can be compared between 3 work stations and 2 work stations. Comparison for the total delay in cycle times of 42 minutes and 43 minutes is 33.33% (3 stations) and 6.97% (2 stations). Comparison for total efficiency in 43 cycle time is 66.67% (3 stations) and for 42 minute cycle is 93.03% (2 stations). So it can be concluded that the lowest level of delay andthe highest level of efficiency is 2 work stations with a cycle of 43 minutes. The results above show that the maximum efficiency level achieved is 2 work stations with a production cycle time of 43 minutes with a delay rate of 6.97% and an efficiency level of 93.03%. DaftarPustaka:20(1998-2019)

Item Type: Thesis (TA, Skripsi, Tesis, Disertasi) (Sarjana (S1))
Contributors/Dosen Pembimbing,NIDN Dosen bisa diakses di LINK https://bit.ly/NIDNdosenunismabekasi:
ContributionContributors / Dosen PembimbingNIDN
UNSPECIFIEDPangestuti, Rinda Siaga0428118904
Keywords / Kata Kunci: Penerapan layout dengan metode line balancing.
Subjects: Manajemen Operasional
Manajemen
Manufaktur
Faculty: Fakultas Ekonomi > Manajemen S1
Depositing User: Ms. Dinda Alexandra
Date Deposited: 21 Feb 2023 07:03
Last Modified: 21 Feb 2023 07:03
URI: http://repository.unismabekasi.ac.id/id/eprint/2356

Actions (login required)

View Item View Item