Lestari, Yulia Sinta Budi (2026) Perbandingan Kadar Aspal Hasil Ekstraksi Pada Campuran Asphalt Concrete Wearing Course (AC-WC) di Asphalt Mixing Plant (AMP), Belakang Finisher dan Hasil Core Drill terhadap Job Mix Formula (JMF). Sarjana (S1) thesis, Universitas Islam 45.
|
Text
PENDAHULUAN.pdf Download (2MB) |
|
|
Text
BAB I.pdf Restricted to Repository staff only Download (219kB) | Request a copy |
|
|
Text
BAB II.pdf Restricted to Repository staff only Download (772kB) | Request a copy |
|
|
Text
BAB III.pdf Restricted to Repository staff only Download (438kB) | Request a copy |
|
|
Text
BAB IV.pdf Restricted to Repository staff only Download (994kB) | Request a copy |
|
|
Text
BAB V.pdf Restricted to Repository staff only Download (219kB) | Request a copy |
|
|
Text
Daftar Pustaka.pdf Download (101kB) |
Abstract
Asphalt content is the percentage of asphalt content in the mixture that affects the performance and service life of road pavement. Changes in asphalt content during the production process and implementation in the field must be controlled to meet the provisions of the 2025 Bina Marga General Specification with a tolerance limit of ±0.3% to the Job Mix Formula (JMF) asphalt content. This study aims to analyze and compare the results of asphalt content extraction in the Asphalt Concrete–Wearing Course (AC-WC) mixture taken from the Asphalt Mixing Plant (AMP), behind the finisher, and from the results of the core drill after compaction, as well as examine the causes of the decrease in asphalt content. The method used is the extraction of asphalt content testing using the Trichloro Ethylene (TCE) solvent. The test results showed an average value of asphalt content of 5.38% in the AMP sample, 5.35% behind the finisher, and 5.31% in the core drill results, while the JMF asphalt content was 5.40%. These results show a decrease in asphalt content along with the implementation stage, but all values are still within the specification tolerance limit. The decrease in asphalt content is influenced by the process of transportation, spreading, compaction, and sampling methods and locations, so quality control needs to be carried out consistently at each stage of work. Keywords: Extraction, Asphalt Content, AC-WC
| Item Type: | Thesis (TA, Skripsi, Tesis, Disertasi) (Sarjana (S1)) | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Contributors/Dosen Pembimbing,NIDN Dosen bisa diakses di LINK https://bit.ly/NIDNdosenunismabekasi: |
|
|||||||||
| Keywords / Kata Kunci: | Ekstraksi, Kadar Aspal, AC-WC | |||||||||
| Subjects: | Eksperimen Transportasi (Perancangan Jalan) |
|||||||||
| Faculty: | Fakultas Teknik > Teknik Sipil S1 | |||||||||
| Depositing User: | Ms. Yulia Sinta Budi Lestari | |||||||||
| Date Deposited: | 26 Feb 2026 08:24 | |||||||||
| Last Modified: | 26 Feb 2026 08:24 | |||||||||
| URI: | http://repository.unismabekasi.ac.id/id/eprint/9479 |
Actions (login required)
![]() |
View Item |
