Sumardi, Ekananda Novianti (2025) Perencanaan Pengukuran Kerja Dalam Menentukan Waktu Standar Dengan Metode Time Study Guna Meningkatkan Produktivitas Kerja pada PT KMI. Sarjana (S1) thesis, Universitas Islam 45.
![]() |
Text
PENDAHULUAN.pdf Download (429kB) |
![]() |
Text
BAB I.pdf Download (145kB) |
![]() |
Text
BAB II.pdf Restricted to Repository staff only Download (255kB) | Request a copy |
![]() |
Text
BAB III.pdf Restricted to Repository staff only Download (148kB) | Request a copy |
![]() |
Text
BAB IV.pdf Restricted to Repository staff only Download (446kB) | Request a copy |
![]() |
Text
BAB V.pdf Download (76kB) |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (87kB) |
Abstract
The purpose of this study is to examine the use of methods in increasing productivity in PT KMI. Through this study, the production of Frame Comp LX 150 frame in the Welding section is evaluated. This study aims to analyze actual working time and determine standard time using the Time Study method to increase productivity in this section. This study uses a quantitative approach with direct observation techniques and work time measurement which was carried out 30 observations. The results showed that the average time to produce one unit of the Frame Comp LX 150 frame was 11 minutes longer than the company's standard time of 7.6 minutes and the standard time of the research results was 12 minutes slower than the company's 7.6 minutes. Furthermore, based on the results of different standard times, the labor productivity set by the company with different research results is 14% for the company and 22% for the research results, so that the productivity obtained by the researcher is greater than that set by the company. Thus, this study concludes that the use of the Time Study method shows that the time allowance in the company's time standard has not been maximized as seen from the results of research observations 30 times. The use of time and productivity standards can also help companies in identifying and solving problems that exist in various aspects of the company. Keywords: Production, Standar Time, Time Study, Productivity
Item Type: | Thesis (TA, Skripsi, Tesis, Disertasi) (Sarjana (S1)) | ||||||
---|---|---|---|---|---|---|---|
Contributors/Dosen Pembimbing,NIDN Dosen bisa diakses di LINK https://bit.ly/NIDNdosenunismabekasi: |
|
||||||
Keywords / Kata Kunci: | Produksi, Waktu Standar, Time Study, Produktivitas Kerja | ||||||
Subjects: | Manajemen Operasional | ||||||
Faculty: | Fakultas Ekonomi > Manajemen S1 | ||||||
Depositing User: | Ms Ekananda Novianti | ||||||
Date Deposited: | 02 Jul 2025 08:14 | ||||||
Last Modified: | 02 Jul 2025 08:14 | ||||||
URI: | http://repository.unismabekasi.ac.id/id/eprint/7927 |
Actions (login required)
![]() |
View Item |