Ningsih, Sanih Setia (2025) ANALISIS IMPLEMENTASI SISTEM PENGENDALIAN MANAJEMEN MUTU MENGACU ISO 9001:2015 DALAM MENGENDALIKAN DOWNTIME DI PT. UNITED EQUIPMENT INDONESIA. Sarjana (S1) thesis, Universitas Islam 45.
![]() |
Text
PENDAHULUAN_SANIH1.pdf Download (373kB) |
![]() |
Text
BAB 1.pdf Download (230kB) |
![]() |
Text
BAB 2.pdf Restricted to Repository staff only Download (500kB) | Request a copy |
![]() |
Text
BAB 3.pdf Restricted to Repository staff only Download (250kB) | Request a copy |
![]() |
Text
BAB 4.pdf Restricted to Repository staff only Download (713kB) | Request a copy |
![]() |
Text
BAB 5.pdf Download (119kB) |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (190kB) |
Abstract
This study aims to analyze the implementation of ISO 9001:2015 in controlling downtime at PT United Equipment Indonesia. The research method used is qualitative descriptive, utilizing observation, documentation, and internal audits as data collection techniques. The analysis was carried out using three of the seven quality control tools, namely Check Sheet, Pareto Diagram, and Fishbone Diagram. The results showed that the dominant cause of downtime was equipment damage, followed by methods and operator error, indicating the need for improved SOPs and operator training.
Item Type: | Thesis (TA, Skripsi, Tesis, Disertasi) (Sarjana (S1)) | ||||||
---|---|---|---|---|---|---|---|
Contributors/Dosen Pembimbing,NIDN Dosen bisa diakses di LINK https://bit.ly/NIDNdosenunismabekasi: |
|
||||||
Keywords / Kata Kunci: | ISO 9001:2015, downtime, pengendalian mutu, alat berat, sistem manajemen mutu | ||||||
Subjects: | Manajemen Operasional | ||||||
Faculty: | Fakultas Ekonomi > Manajemen S1 | ||||||
Depositing User: | Ms. Sanih Setia | ||||||
Date Deposited: | 21 Jul 2025 04:01 | ||||||
Last Modified: | 21 Jul 2025 04:01 | ||||||
URI: | http://repository.unismabekasi.ac.id/id/eprint/8045 |
Actions (login required)
![]() |
View Item |