ANALISIS STANDAR WAKTU GUNA MENINGKATKAN PRODUKTIVITAS KERJA DENGAN MENGGUNAKAN METODE TIME STUDY PADA CV CATUR MANDIRI

Agustin, Dini (2022) ANALISIS STANDAR WAKTU GUNA MENINGKATKAN PRODUKTIVITAS KERJA DENGAN MENGGUNAKAN METODE TIME STUDY PADA CV CATUR MANDIRI. Sarjana (S1) thesis, Universitas Islam “45” Bekasi.

[img] Text
Pendahuluan (1).pdf

Download (1MB)
[img] Text
BAB I.pdf

Download (329kB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (858kB) | Request a copy
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (456kB) | Request a copy
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (652kB) | Request a copy
[img] Text
BAB V.pdf

Download (209kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (322kB)

Abstract

The purpose of this study was to determine the application of the standard time of the production section at CV Catur Mandiri. To find out the inhibiting factors that cause the production process to exceed the standard time set by the production company at CV Catur Mandiri. To find out the productivity of the production workforce at CV Catur Mandiri. In this research, the research method used is descriptive quantitative research method to investigate the circumstances, conditions, or other things that have been mentioned, the results of which are presented in the form of a research report. Data was collected by conducting observations, interviews, literature studies and documentation. The data analysis technique used is the measurement of work standards, calculation of labor requirements based on workload, determining the inhibiting factors of the production process and labor productivity. Based on the data analysis, it was found that: 1. The time needed to produce melamine plywood was 204 minutes with a total workforce of 3 workers. 2. Based on the fishbone analysis, it can be concluded that the factors causing the time delay are humans, machines, materials, machines, and the environment. From the comparison of the need for the number of workers determined by the company and according to the calculations of researchers, the change in labor productivity from 6 workers to 3 workers. In general, it can be concluded that the analysis of time standards in order to increase work productivity by using the Time Study method on CV Catur Mandiri is good.

Item Type: Thesis (TA, Skripsi, Tesis, Disertasi) (Sarjana (S1))
Contributors/Dosen Pembimbing,NIDN Dosen bisa diakses di LINK https://bit.ly/NIDNdosenunismabekasi:
ContributionContributors / Dosen PembimbingNIDN
UNSPECIFIEDHendrayanti, Endang0428017202
UNSPECIFIEDPangestuti, Rinda Siaga0428118904
Keywords / Kata Kunci: Analisis Standar Waktu, Produktivitas Kerja, Metode Time Study
Subjects: Manajemen Operasional
Manajemen
Manufaktur
Faculty: Fakultas Ekonomi > Manajemen S1
Depositing User: Mis Dini Agustin
Date Deposited: 19 Sep 2022 07:24
Last Modified: 19 Sep 2022 07:24
URI: http://repository.unismabekasi.ac.id/id/eprint/1202

Actions (login required)

View Item View Item